185th St Sewer Extension

New green sewer line being installed at the bottom of a narrow trench

Our work here consisted of 220-foot 8” sewer extension through high groundwater, road widening, and curb and sidewalk construction.

Columbia Palisades

Modern grey home with gravel and boulder hardscaping on the property perimeter.

A custom home community, our work here consisted of foundation dig out, haul off of excess soil, installation of all underground utilities to the units, backfill of units and all fine grading as well as erosion monitoring.

Gradewerks Columbia Palisades 13

Two Creeks at Camas Meadows

Backhoe in a alley amongst townhouses on a rainy day

A high-end 122-unit multi-family development in Camas, WA. Our work here consisted of foundation dig out, haul off of excess soil, installation of all underground utilities to the units, backfill of units, and all fine grading as well as erosion monitoring.

Crossings Phase 2

Blue electrical line and white sewer pipes in the ground in at construction site.

A 53 unit multi-family development in Ridgefield, WA. Our work here consisted of foundation dig out, haul off of excess soil, installation of all underground utilities to the units, backfill of units and all fine grading as well as erosion monitoring.

Crossings Phase 3

Aerial view of heavy machinery equipment working in new residential home construction in newly developed neighborhood

A 45-unit multi family development in Ridgefield, WA. Our work here consisted of foundation dig out, haul off of excess soil, installation of all underground utilities to the units, backfill of units and all fine grading as well as erosion monitoring.

Boulder Ridge

Kobelco heavy machinery moving boulders in fenced in area

A high-end 34-unit multi-family development in Camas, WA. Our work here consisted of foundation dig out, heavy rock excavation, haul off of excess soil, installation of all underground utilities to the units, backfill of units and all fine grading as well as erosion monitoring.

Pioneer East

New construction job site with townhouses in background

A 209 lot single family development in Ridgefield, WA. Our work here consisted of foundation dig out, haul off of excess soil, installation of all underground utilities to the units, backfill of units, and all fine grading as well as erosion monitoring.

Crossings Phase 1

Blue and grey townhouses with concrete foundation for driveways in new construction development.

A 36 unit multi-family development in Ridgefield, WA. Our work here consisted of foundation dig out, haul off of excess soil, installation of all underground utilities to the units, backfill of units, and all fine grading as well as erosion monitoring.

Gradewerks, Crossings Phase 1 - 13