Our work here consisted of 220-foot 8” sewer extension through high groundwater, road widening, and curb and sidewalk construction.
![185th St Sewer Extension -1](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3018_1-scaled.jpg)
![185th St Sewer Extension- green line](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3110_1-scaled.jpg)
![185th St Sewer Extension - dirt trench](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3104-scaled.jpg)
![185th St Sewer Extension - excavator digging](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3111-scaled.jpg)
![185th St Sewer Extension - excavation](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3129-scaled.jpg)
![185th St Sewer Extension - backyard](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3019-scaled.jpg)
![185th St Sewer Extension - dirt compactor](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3021-scaled.jpg)
![185th St Sewer Extension - employee digging](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3100-scaled.jpg)
![185th St Sewer Extension - Sewer install](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3102-scaled.jpg)
![185th St Sewer Extension - Heavy equipment](https://gradewerks.com/wp-content/uploads/2022/10/IMG_2988-scaled.jpg)
![185th St Sewer Extension - House](https://gradewerks.com/wp-content/uploads/2022/10/IMG_2996-scaled.jpg)
![185th St Sewer Extension - Lowering sewer](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3016-768x1024.jpg)
![185th St Sewer Extension - blue line](https://gradewerks.com/wp-content/uploads/2022/10/IMG_3017-scaled.jpg)
Our work here consisted of 220-foot 8” sewer extension through high groundwater, road widening, and curb and sidewalk construction.